Category: Breaking News

  • Breaking News

    Breaking News

    Breaking News | Brazil Offshore & Maritime Update

    P-52 remains offline after gas-lift riser incident

    Petrobras’ P-52 remains shut down at the Roncador field, nine months after a flammable gas leak led to an emergency shutdown. The ANP has not authorized its restart, and Petrobras has not established a return date. The unit was producing approximately 35,000 barrels per day before the shutdown.

    P-33 begins voyage to Rio Grande for dismantling

    Petrobras’ former P-33 production unit left Porto do Açu on July 23 for the Rio Grande shipyard, where it will be dismantled and recycled. The unit was sold in 2023 to Gerdau, in partnership with Ecovix, and had been moored at Açu since February 2024.

    Normand Turmalina hauled out for maintenance

    The Brazilian-flagged AHTS Normand Turmalina has been hauled out for maintenance and preservation work. The team involved in the manoeuvre described the vessel as weighing approximately 5,000 tonnes and identified Dock Brasil as responsible for the engineering works. The location and scope of the maintenance were not disclosed.

    ANP approves review of marine fuel specifications

    The ANP approved a 45-day public consultation and a public hearing on proposed revisions to Brazil’s specifications for marine diesel and marine fuel oil. The draft updates the regulations to international standards and introduces rules for renewable and synthetic marine fuels.

    Consultation on Brazilian supplier preference closes

    The ANP’s 60-day preliminary consultation on equal opportunity and preferential treatment for Brazilian suppliers in oil and gas procurement closed on July 24. The proposal covers procurement schedules, preference margins, supplier complaints, regulatory oversight and penalties.

    Stay informed on key offshore developments.

  • Breaking News: Mayday Skandi Logger

    Breaking News: Mayday Skandi Logger

    BREAKING NEWS:

    Our newsroom has received an audio recording reportedly from the bridge of the Skandi Logger, broadcasting a Mayday distress call and an order to abandon ship near the P-37 platform in the Marlim field. The vessel’s position has been confirmed.

    Sources at the scene report that the vessel is already receiving assistance and connected for towing. The situation appears to be under control. At this stage, there is no confirmed information of any injuries or casualties.

    In contact with our team, DOF said:

    “DOF reports that, in the early hours of Wednesday (22), the Skandi Logger experienced an electrical short circuit, with no open flame, in its main switchboard while operating alongside the P-37 platform in Brazil’s Campos Basin.

    The company responded immediately to the incident and is providing full support to the onboard crew, while also coordinating and planning the operation to release the vessel from the field and carry out the necessary repairs.

    No injuries were reported among those on board, and, at this time, no environmental impact has been identified.

    The vessel remains under control, and DOF continues to monitor the situation while taking all necessary measures to ensure the safety of personnel, the environment, and the operation”

    We are seeking further details from Brazilian Navy and will provide updates as information becomes available.