Author: Rafael Bortoloti

  • New WSSV tender

    New WSSV tender

    Petrobras issued a new tender for the contracting of a WSSV (Well Stimulation
    Support Vessel). The contract period is of four years firm with commencement expected
    for 365 days upon contract execution. The tender will accept Brazilian (or REB) and
    foreign tonnage, although the later will only be considered in case no Brazilian flagged vessel
    is offered.

    All vessels currently working for Petrobras under this scope are foreign flagged. This type of tender foresees three different types of contracts with the awarded company: charter party agreement, well stimulation services and supply of chemical products. Bidders have until May 22nd to present an
    offer.

  • Prio with new psv

    Prio with new psv

    PSV 3500 CBO Ana Luisa has been fixed by PRIO for 9 months firm plus an optional period
    of 3 months with commencement expected for July, 2023. The award was given in connection
    to the tendering process for contracting of a small fluid carrier vessel. She will support the
    upcoming drilling activities of PRIO in some of their offshore assets. She has previously
    operated in the integrated logistics contract between CBO and Petrobras.

  • Oceanica new vessels

    Oceanica new vessels

    The Norwegian shipyard Green Yard Kleven AS has signed a retrofit project with the Brazilian
    shipowner Oceânica. This is the fourth contract signed between them. The AHTS is now named
    Oceanicasub X. The vessel will be rebuilt for operations off the Brazilian coast. The new
    contract follows the deliveries of Oceanicasub VIII and Oceanicasub IX last month, both
    vessels recently arrived in Brazilian waters

  • Karoon done with rig

    Karoon done with rig

    Karoon Energy announced last week that it has completed the drilling program in Santos
    Basin, offshore Brazil, with drilling rig Noble Developer from owners NobleCorp. The vessel
    mobilised to Brazil in April, 2022 to carry out the Company´s first workover campaign and
    field development in Brazil. Interventions were made in the Baúna, Patola and Neon fields.
    It is now expected that the drilling unit will be mobilised to Shell.

  • Enauta resumes production

    Enauta resumes production

    Enauta resumed production from well 7-ATL2HP-RJS (“2HP”), in Atlanta field having returned after an interruption that began in March, forced by a failure of a surface equipment. The company informed that
    production was resumed after the replacement of a pump on the seabed. The production unit Petrojarl I installed at Atlanta field produces around 30,000 barrels of oil per day with storage capacity for 180,000 barrels. The company stated that it will keep the market informed about the matter

  • Those floating hulls

    Those floating hulls

    By Alexandre Vilela

    Also read in our magazine One.Energy

    One.Energy Magazine – Issue nº 4

    A junk yard of 100 + units

    The situation is alarming.

    This last quarter two cases involving vessels have caught the public eye relative to the ageing tonnage ol the shipping industry in Brazil. In one hand the incident involving the M/V São Luiz, an out-of-service bulk carner that crasined against the Rio-Niterói bridge, brought hell to the already mad traffic in Rio de Janeiro and Niterói as the bridge was momentarily closed in the middle of rush hour and a tropical storm. The vessel that was anchored at the bay before getting lose and hitting the bndge was towed away to a nearby safe berth.

    On the other hand, former Brazilian navy aireraft carrier NAe São Paulo has been auctioned and sold to a Turkish buyer, exported and underway to its destiny port had its entry denied by Turkish authorities, the export license re voked by the Brazilian environmental authorities, thus the convoy turned back to Rio de Janeiro al the way from nearly entering the Mediterranean, yet denied entry in Rio and instructed to proceed up north to Pernambuco. The compromised hull remains connected to the doeangoing tug ofishore Recife for weeks, said to contain a protrusion of approximately 3m just above the water line.

    Both cases are surrounded with clashing legal appeas and challenges betwean involved parties. No, not only between buyer and seller but aiso environmental, judicial executive authorties in many layers of bureaucracy and endless discussions.

    Also read in our magazine One.Energy


    One.Energy Magazine – Issue nº 4

    Rio in the middle

    For Rio, the situation is specially alarming.

    Rio de Janeiro has a long history as a central hub for navigation in South America. Additionally, it has led the two separate shipbuilding industry cycles in Brazil, in the 70’s and in the 2000 s, featuring the largest shipbuilding and ship repair complex in country. with yet some units active.

    Further, Rio hosts most of the shipping companies, its agents and commis-sionaires, the offshore support industry for the oil and gas sector. Rio is the natural port for the admission, export and import, temporary admission and inspection of rigs and olishore units, the central cruise line destination in the east coast of South America and homeport of the highest concentration of fishing and lei-sure boats in the southeast Brazilian coast.

    Therefore, naturally, maybe unfortunately, the state carries the burden of having to deal with the challenges of an ageing shipping industry. Owners would not naturally turn else-where if not Rio de Janeiro to “deposit” the ageing fleet, until some commercial sense could make it go away. Importers wouldn’t be able to sail elsewhere if a problem is en-countered, exporters must turn back or even not sail away if the process is not cleared to destination.

    MN São Luiz and NAe São Paulo are clear examples of the messy dilemma, and they are only the tip of the tropical iceberg.

    One.Energy Magazine – Issue nº 4

    Also read in our magazine One.Energy

    NAe São Paulo (Source: Internet)

    The burial ground

    The situation is indeed alarming.

    Rio is said to embrace more than 100 ships in out-of-service or abandoned condition. From various sizes, different segments within shipping from fishing through cabotage and deepsea shipping all the way into offshore support vessels. IMO listed and smaller craft. Registered tonnage, abandoned tonnage, unidentified tonnage. Floating, grounded, berthed, manned, unmanned, keeled over, listed completely sunk. With commercial value, without commercial value. With debt that is unpayable in this lifetime. Arrested by justice, locked by navy, anchored by Neptune containing asbestos, having people on board stealing what is left, having people on board in poor working condition, having people on board in no working condition. And just a few adequately kept and maintained, many cold stacked, some rare in warm stack, the only ones possibly having a new employment.

    And the main issue is that no single authority or group of authorities, or companies, or academic, are fully aware and truly know what the effective number of ships, or hulls, are really deposited in Rio. If any have an es-timate, rest assured the number is only an estimate but moreover yet unprecise as to real condition, be it physical or fiscal, of the equipment.

    Also read in our magazine One.Energy

    One.Energy Magazine – Issue nº 4

    Don’t blame the navy

    The navy is the middle of the alarming situation. Caught in the middle. A democratic country has love for the legal procedure. And there relies on the main barrier, and the reason why the Navy can’t be blamed. The law established that the Navy is responsible for the removal and the demolition of sunk, sub-merged, grounded, and lost assets because of an incident or misfortune at sea. See?

    The Navy can’t exactly take over a vessel. or hull, in whatever condition (except as specifically provided by law as above) that nas 16 an idenufied owner, or owners, or interested parties, under a legal dispute, where other authorities are also taking part in discussions and valuations and where parties have economical interest, even if those interests are purely related to vacating the debt or selling the steel. Further, the Navy is also allowed by law to delegate such responsibilities to other authorities such as the environmental in either state or federal level.

    Complex, very complex.

    Also read in our magazine One.Energy

    Slow, slow, slow

    The situation is more than alarming. is crit-ical. Imagine. In the case of the MY São Luis, one month prior to the incident with the Rio-Niterói bridge, the port authority, which is involved in the legal case at court, requested the court for authorization to embark the ves. sel for certain safety measures which included inspections, welding and closing of bottom plugs, valves, sea chests and other parts, as well as the reinforcement of the anchorng of the vessel with potentially an additional mooring point to safeguard the vessels trom losing anchor.

    The court decided favorably on this request 2 days alter the vessel nagu the bridge, in this JC year of 2022. The court case is on and the vessel in this location and poor condition since 2016 Courts are only slow, or they also don’t read the newspaper?
    Fair enough, here is a piece of improvement that can be pointed at, nevertheless, when will a serious study be commissioned and a joint effort lead by authorities be put in place to resolve the critical part of this situation?

    Also read in our magazine One.Energy

    One.Energy Magazine – Issue nº 4

    Pointing at the fact that Rio de Janeiro state have taken over the area of that yard which has figured amongst the largest and most important in country in better days located in the Guanabara Bay. In itself currently not anything better than a junkyard in itself but naving a lot of potential for this and many oiner activities. Luckly we already see some movement from authorties in discussing its use Hoping for better days. The memory of the shipping industry deserves, as putting a decent end to the lifecycle of such equipment is very important to ensure its continuity.