BRAVA Energia closed August with an average production of 92,400 boed, up 1.6% from July and marking its second consecutive monthly record since the merger of Enauta and 3R Petroleum. The Atlanta field stood out, reaching its highest production level to date with 30,065 bbl/d.
TechnipFMC signed two contracts with Petrobras to supply subsea flexible pipes from its Porto do Açu facility. The first, valued between USD 250–500 million, covers risers for gas injection in the Santos Basin pre-salt. The second, worth between USD 75–250 million, includes risers and flowlines for the Campos Basin.
Fugro secured two three-year contracts with Constellation to provide ROV services for inspection, intervention and subsea surveys. Operations will start this quarter in the Campos Basin with the drillship Tidal Action and expand to the Equatorial Margin in 2026 with the Amaralina Star.
Oceaneering closed multiple Petrobras contracts for Subsea Robotics services, totalling around USD 180 million over four years, with scope covering inspection, maintenance, repair, FPSO tie-ins and decommissioning. Its Norwegian subsidiary also signed a structural maintenance contract with Equinor, running until 2027 with possible extensions, covering both onshore and offshore facilities.
Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies.
Author: Rafael Bortoloti
-

Breaking News
-

Petrobras relaunches BID
Petrobras has reissued BID 7004478234 for the chartering of up to six Service Operation Vessels (SOVs), following previous postponements. The new submission deadline is September 23 at 5:00 p.m. local time, as per latest circulars, with contracts typically lasting 730 days (two years) and extension options available.
The company confirmed it has received requests and will publish revised technical specifications on the Petronect platform shortly. Key adjustments include a reduction of the gangway zero position from 25.5 to 25 meters, noting that a total gangway length exceeding 29m is required for this operation, alongside modifications to maximum vessel draft and other requirements, though these may still be subject to further refinements.
For further details, contact us at comercial@cms.oneenergynews.com.
Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies. -

Discover One. Energy
At WSB Advisors, we believe knowledge is one of the strongest assets in the offshore and energy markets. That is why we created One. Energy, our digital magazine dedicated to sharing insights, trends and perspectives that matter to industry professionals.
Each edition brings articles on technology, regulation, energy transition and market strategies — all built on the expertise and data intelligence of WSB.One, our proprietary platform.
We welcome contributions from industry experts and partners who want to share their views or showcase solutions. If you are interested in participating or advertising in One. Energy, feel free to reach out at comercial@cms.oneenergynews.com. -

Open Tenders & More
Dear All,
WSB is pleased to provide an update on the current long-term tenders that are open to offer.
Open tenders:

What has changed?
- Petrobras Up to 6x SOVs : Opportunity 7004478234 new deadline September 12th, 2025;
What else is happening?
- Petrobras SDSVs auction closed today, and the market now waits auction results to see which company(ies) will secure contracts.
- A foreign vessel lined up for a Petrobras SEP contract is now flying Brazil flag and on-hire for 4 years firm. Yet another vessel under someone else’s REB tonnage.
-

Breaking news
Karoon has announced planned investments between USD 55 million and USD 65 million in 2026 to revitalize the FPSO Cidade de Itajaí at the Baúna field, along with an additional allocation of up to USD 90 million between 2030 and 2034 to extend the unit’s operating life. The company also revised abandonment costs for the field, now estimated at USD 260 million through 2039. Following positive production results, proven and probable reserves increased by 35%, reaching 52.7 million barrels. The project’s economic life has been extended from 2032 to 2039, with production expected to continue until 2040.
Petrobras expects to complete this week the Pre-Operational Assessment (APO) required to obtain Ibama’s license to begin oil exploration in well FZA-M-59, off the coast of Amapá. This step is regarded as the final stage before environmental clearance is granted and focuses on testing environmental safety, including simulated oil spills, equipment failures and emergency response protocols. The operation mobilizes around 400 professionals, 13 vessels and 3 aircraft. Ibama had previously denied the license request, but Petrobras sought reconsideration, committing to additional protection measures.
Adding to the sector’s activity, Petrobras has also extended the deadline for Opportunity 7004478234, a significant tender for up to six Service Operation Vessels (SOVs), now set for September 12th, 2025..
Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies. -

Unlocking the Brazilian Offshore Market with WSB.One Intelligence
The complexity and dynamic nature of the Brazilian offshore market demand a data source as robust as it is precise. Introducing WSB.One, the market intelligence platform meticulously developed in-house by WSB Advisors to be your competitive edge. WSB.One provides a comprehensive and continuously updated database featuring technical, commercial and contractual information on hundreds of offshore support vessels, rigs, and FPSOs operating in Brazilian waters. Our team of experts reviews and updates this data daily, ensuring you gain real-time access to crucial market movements and emerging trends.
This unparalleled accuracy enables contracting companies not only to anticipate new business opportunities but also to map the competitive landscape with unprecedented clarity. It serves as your strategic compass, transforming raw knowledge into a tangible competitive advantage, identifying promising trends and driving the sustainable growth of your operations within the sector.
How has market intelligence been a cornerstone for your strategic decisions in the current offshore landscape?
-

Vast: new project
Vast Infraestrutura announced on Tuesday (August 26) the start of construction for the tank farm at the Liquid Bulk Terminal (TLA), in Porto do Açu, in São João da Barra. Since October 2024, the TLA has been operating with ship-to-ship transfers and the supply of marine diesel oil (MGO) and hydrotreated vegetable oil (HVO).
The new facility will enable the storage and handling of additional petroleum derivatives and biofuels, with operations scheduled to begin in the last quarter of 2026. The project represents an initial investment of BRL 250 million, with a storage capacity of approximately 40,000 m³.
Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies. -

Petrobras: Staff announcement
Petrobras has appointed Bruno Moretti as the new Chairman of its Board of Directors, succeeding Pietro Mendes, who stepped down to assume a leadership role at Brazil’s National Petroleum Agency (ANP). Moretti will serve until the company’s next General Meeting, scheduled for 2026.
He holds a degree in Economics from UFF, a master’s in Industrial Economics from UFRJ, and a PhD in Sociology from UnB. Currently, he is pursuing a doctorate in Economic Development at Unicamp. Moretti also brings extensive experience in the public sector, having served in various ministries and in the Federal Senate. Additionally, he currently sits on Petrobras’ Investment Committee.

Bruno Moretti (Source: Brazilian Senate) -

Petrobras APO Equatorial Margin
Petrobras began a simulated safety drill on Sunday, August 24th, along the maritime coast and rivers of Oiapoque in the state of Amapá. The exercise is part of the Pre-Operational Assessment (APO), the final stage in the environmental licensing process required for drilling a well in offshore block FZA-M-59, located in the Foz do Amazonas Basin — a key area within the promising Equatorial Margin.
Scheduled to conclude on Friday, August 29th, the drill mobilizes over 400 professionals, helicopters and large-scale vessels, including the drillship NS-42, operated by Foresea. Brazil’s environmental agency, Ibama, is monitoringis the operation assessing the efficiency of equipment, response times, wildlife rescue protocols and communication with authorities.
Petrobras’ performance in this simulation will be a decisive factor in securing the environmental license required to move forward with exploratory drilling, a goal the company has pursued for years amid regulatory challenges. The APO represents a critical milestone not only for Petrobras but also for Brazil’s broader offshore exploration strategy. If successful, it could open a new energy frontier in the Foz do Amazonas Basin, generating opportunities across the supply chain and strengthening Brazil’s position in the global energy market.
Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies and our website cms.oneenergynews.com. -

Open Tenders & More
What has changed?
- Petrobras At least 1x ORSV 105: Opportunity 7004492154 new deadline September 11th, 2025;
- Petrobras At least 1x FSV: Opportunity 7004492292 new deadline September 12th, 2025;
- Petrobras At least 1x LH: Opportunity 7004484466 new deadline September 12th, 2025;
- Petrobras Up to 17x PSVs : Opportunity 7004439824 new deadline September 12th, 2025;
- Petrobras At least 1x FSC 10/25/60: Opportunity 7004480345 new deadline September 12th, 2025;
- Petrobras At least 1x LH: Opportunity 7004497614 new deadline September 12th, 2025;
- Petrobras Acquisition of 8x GLP TRANSPETRO Vessels: Opportunity 7004344317 new deadline September 22nd, 2025;
- Petrobras FPSO for Albacora Revitalization: Opportunity 7004415516 new deadline December 15th, 2025.
What else is happening?
- Petrobras secures AKOFS Santos in a four-year firm MPSV charter, with operations set to begin in Q3 2026.
- Transpetro will be relaunching the barges tender, now seeking to hire 20 units with bidding expected to open in September.
- DOF has announced an amendment to its long-term inspection contract with Petrobras, valued at over USD 50 million, with completion expected by the end of 2025. The vessels Stril Explorer, Geoholm, and Skandi Carla are involved in this contract. In addition, the company has secured a new four-year contract with Petrobras for the Skandi Salvador, which will operate with two ROVs and a subsea crane. The estimated value of this new contract is approximately USD 165 million, with operations scheduled to begin in December.
-

Navalshore and Brazilian Party
At the opening of Navalshore, last tuesday (August 19) Transpetro CEO Sérgio Bacci announced the effectiveness of the contract for the construction of Handy size tankers at the Ecovix shipyard, under the Ecovix–Mac Laren consortium. These vessels, intended for Transpetro, will strengthen Brazil’s cabotage operations and the distribution of oil products along the coast. The contract, signed earlier this year, now enters into force, marking a significant step for Brazil’s shipbuilding sector and reinforcing the strategic role of domestic yards in supporting the country’s energy logistics.
This was the 19th edition of the event, which ran for three days and concluded last Thursday (August 21), bringing together thousands of attendees and leaders from major offshore companies.
Also at Navalshore, Bacci confirmed that the bid for the chartering of eight newbuilding gas carriers will have its packages opened on September 22. This tender is widely considered the most significant Petrobras and Transpetro initiative in 2025, forming part of the Fleet Renewal and Expansion Program that aims to strengthen Brazil’s energy logistics. Bacci also confirmed that Transpetro will launch Phase 3 of its fleet renewal program in September, which includes the chartering of four MR1-class vessels.
WSB Presence:
On the evening of August 20, WSB was present at the third edition of the Brazilian Party, held at the Rio de Janeiro Yacht Club. Representing the company were Raphael Montes (Proposals Manager & Partner), Genésio Ramos (Newbuild Lead), Pedro Pellegrini (Shipbroker Intern), and Maria Eduarda Camba (Shipbroker Intern).
The event took place in parallel with Navalshore, one of the largest shipbuilding exhibitions in the world, and gathered around 600 executives from across the maritime and offshore industry. Performances by Ferrugem and Capital Elétrico made the evening even more remarkable, reinforcing the Brazilian Party’s role as a key networking and cultural highlight for industry professionals.
“Attending Navalshore for the first time was an incredible experience! I had the chance to network with industry professionals and gain a broader perspective on the market. I truly enjoyed being part of it and definitely look forward to joining future editions”, said Maria Eduarda Camba.
-

Latest news
At Navalshore, Transpetro CEO Sérgio Bacci has confirmed that the bid for the chartering of eight newbuilding gas carriers will have its packages opened on September 22. This tender is widely considered the most significant Petrobras and Transpetro initiative in 2025, forming part of the Fleet Renewal and Expansion Program that aims to strengthen Brazil’s energy logistics.
In parallel, OceanPact secured four new contracts with Petrobras, Parcel do Bandolim, Parcel das Timbebas, Parcel das Paredes and Parcel dos Reis, with a total value of BRL 3.2 billion. These agreements cover the chartering of RSV vessels over the next four years to support subsea operations with ROVs, including inspection, maintenance and equipment installation.
Frontier exploration also advanced as the Foresea drillship NS-42, chartered by Petrobras, arrived at block FZA-M-59 in deepwater Amapá. The unit will carry out the Pre-Operational Assessment, the final step in the environmental licensing process before drilling. The exercise, monitored by Ibama, will evaluate Petrobras’ compliance with emergency and wildlife protection plans.
Meanwhile, in the Santos Basin, the Búzios field reached a new production milestone by surpassing 900,000 barrels of oil per day. With six production units currently in operation — P-74, P-75, P-76, P-77, FPSO Almirante Barroso, and FPSO Almirante Tamandaré. Búzios is positioned to overtake Tupi as Brazil’s largest producing asset as early as 2025.