Tag: FPSO

  • Enauta’s oil production

    Enauta’s oil production

    Enauta released the summary of its operating results for May 2024. The Brazilian oil company produced 504 thousand barrels of oil equivalent (boe) in the previous month, with an average of 16.3 thousand barrels per day.

    The numbers represent a drop compared to the previous month when the company produced 600,000 boe, with an average of 20,000 barrels per day. This drop is due to a five-day break for maintenance of the FPSO Petrojarl which works in the Atlanta field, in the Santos Basin. Natural gas production for May was not disclosed by Enauta.

    All this data refers to the Atlanta field, the company’s main asset. It also owns 45% of the Manati field, which is stopped for system adjustments, with the return of production scheduled for the end of June.

  • WSB  in new FPSO arrival

    WSB in new FPSO arrival

    “WSB is proud to cooperate with MISC in several capacities in this project. We are working with the extremely professional team of colleagues from MISC to deliver a successful mobilization of unit” says Omar Darian, Chartering Manager at WSB.

    FPSO Marechal Duque de Caxias has arrived in Brazil this week, set to enhance by 180 thousand boed the production of the Mero Field in the pre-salt region of the Santos Basin to over 590 thousand boed. The unit arrived straight to field, is being moored by Petrobras AHTSs before final preparations to start production shortly.

    Stay tuned for further updates on WSB role on this project and other companies involved, and the exciting developments in Brazil’s energy sector.

  • Petrobras signs deals for FPSOs

    Petrobras signs deals for FPSOs

    Petrobras has awarded two newbuilding contracts valued at approximately S$11 billion ($8.15 billion) to Seatrium for the construction of FPSOs P-84 and P-85.The two units will be installed, respectively, in the Atapu and Sépia fields, in deeper than 2 thousand meters waters in pre-salt of Santos Basin.

    Construction of the P-84 and P-85 FPSOs will commence in first quarter of 2025 with the final delivery expected to be in 2029. The production is expected to begin between 2029 and 2030.

    The vessels will have a daily production capacity of 225 thousand barrels of oil per day and process 10 million cubic meters of gas per day. Construction will be done in shipyards in Brazil, China and Singapore, with local content of 20% in P-84 and 25% in P-85.

    These will be the second units in their respective fields. Atapu already has the P-70, while Sépia has the FPSO Carioca. These projects are expected to reduce the intensity of greenhouse gas emissions by 30% per barrel of oil equivalent produced, being among the most efficient FPSOs in Brazil.

    Petrobras has a 65.7% stake in Atapu, in partnership with Shell (16.7%), TotalEnergies (15%), Petrogal (1.7%) and PPSA (0.9%). In Sépia, Petrobras has a 55.3% stake in partnership with TotalEnergies (16.9%), PETRONAS (12.7%), QatarEnergy (12.7%) and Petrogal Brasil (2.4%).

  • Keppel with 2 potential awards for FPSOs

    Keppel with 2 potential awards for FPSOs

    Keppel is in the virtue of two potential awards for two new pre-salt production units (FPSOs) for Petrobras. The Brazilian state oil company released public tenders on April 2021 and Keppel / Brasfels presented the offers. Platforms P-80 and P-82 shall become the largest production platforms operated in Brazil when finalized, with a capacity of 225.000 barrels per day. The estimated cost of the assets may reach close to USD 5.9 billion offered in total, delivered as from 2026 for Buzios. Negotiations for one unit started.

    Multinacional Keppel Shipyard vence licitação da Petrobras para construção  de plataformas FPSO para exploração de petróleo do pré-sal - CPG Click  Petroleo e Gas