Category: Last News

  • Investments & Innovation – Rio Pipeline and FPSOs

    Investments & Innovation – Rio Pipeline and FPSOs

    The Rio Pipeline & Logistics 2025 kicked off yesterday (November 9), bringing together leaders from the pipeline, transport and logistics sectors in Rio de Janeiro.

    Organized by the Brazilian Institute of Oil and Gas (IBP), the event runs until Thursday (November 11). At the opening session, IBP President Roberto Ardenghy highlighted the inclusion of logistics in the program and reinforced the importance of an integrated view of the energy chain. One of the major announcements was an investment plan of up to BRL 29 billion in infrastructure.

    Energy transition, technological innovation and the expansion of the gas pipeline network are also at the center of discussions.

    Meanwhile, BW Energy has secured a USD 365 million financing package to refurbish and relocate the FPSO Maromba in the Campos Basin. First oil is expected by the end of 2027, with average production estimated at 60,000 boed. The financing, provided by a consortium of international banks, will cover around 80% of the project cost.

    Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies.

  • Open Tenders

    Open Tenders

    By Maria Eduarda Camba

    WSB Advisors is pleased to share an update on Petrobras’ ongoing long-term tenders. Over the past week, several opportunities have had their deadlines extended or specifications adjusted.

    What has changed?

    • Up to 6x SOVs: Opportunity 7004478234 – new deadline September 23rd, 2025;
    • At least 1x LH: Opportunity 7004497614 – new deadline September 25th, 2025;
    • At least 1x FSV: Opportunity 7004492292 – new deadline September 26th, 2025;
    • At least 1x LH: Opportunity 7004484466 – new deadline September 26th, 2025;
    • At least 1x FSC 10/25/60: Opportunity 7004480345 – new deadline September 26th, 2025;
    • Up to 17x PSVs: Opportunity 7004439824 – new deadline September 29th, 2025;
    • At least 1x SESV: Opportunity 7004482740 – new deadline October 3rd, 2025;
    • At least 1x ORSV 105: Opportunity 7004492154 – new deadline September 16th, 2025;

    Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies.

  • WSB Advisors at Sertões Cup

    WSB Advisors at Sertões Cup

    Fernando Vilela, CEO of Café na Trilha and CMO of WSB Advisors, secured the runner-up position in his category at the 2025 Sertões Petrobras Cup, following the third and final stage held this past weekend in Ibitipoca, Minas Gerais.

    Even with a fourth-place finish in the last stage, Fernando accumulated enough points to secure second place in the season’s ranking. The championship also featured stages in Campos do Jordão (SP) and Nova Lima (MG), between May and July.

    The Sertões Cup is one of the most prominent competitions in Brazil’s mountain bike calendar, bringing together athletes of all levels while boosting local economies along its route. Integrated into the traditional Rally dos Sertões, the event stands out for its diversity of modalities, which also include motorcycles and cars, and for the support of major sponsors such as PRIO, a key player in the oil and gas sector.

    Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies.

  • Siblings Day: WSB Advisors on spotlight

    Siblings Day: WSB Advisors on spotlight

    This Friday, September 5th, we celebrate Siblings Day in Brazil, a moment to value the strength and trust that only family ties can bring.

    At WSB Advisors, this bond is part of our story. Brothers Alexandre Mattar Vilela, CEO, and Fernando Vilela, CMO, lead the company together, combining complementary perspectives that shape our role in the offshore market. Their partnership was highlighted today in Correio Braziliense, one of Brazil’s most respected news outlets, further recognizing the importance of shipbrokers in the national industry.

    Happy Siblings Day to all who share this unique connection, a bond that inspires collaboration and resilience both personally and professionally.

    Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies.

  • Special WSB: Did you know?

    Special WSB: Did you know?

    Did you know Brazil is set for a significant offshore transformation?

    Seventeen new Floating Production, Storage and Offloading units (FPSOs) are projected to commence operations between late 2025 and 2030.

    These pivotal projects will be driven by five major oil and gas players: Petrobras, Equinor, BW Energy, Shell and Brava Energy, signaling a period of intense growth and strategic investment.

    Currently, Brazil has 73 production units in operation, including recent additions like the FPSO Maria Quitéria (Yinson), Alexandre de Gusmão (SBM) and Almirante Tamandaré (SBM), which began work this year.

    With the imminent exploration of the Equatorial Margin and a growing market demand for more sustainable solutions, this number is naturally expected to increase.

    Moreover, approximately 50% of the national FPSO and semi-submersible fleet is already considered obsolete, signaling a heated market for these critical assets in Brazilian waters and highlighting the urgent need for infrastructure modernization. These insights reveal a sector in constant evolution, demanding strategic attention to navigate its complex dynamics.

    Curious for more market intelligence and comprehensive data? With WSB.One, you can access detailed information, names and specifics right on your screen with just a few clicks. Explore our platform at wsb-one.com and stay ahead in the offshore market.

  • Breaking News

    Breaking News

    BRAVA Energia closed August with an average production of 92,400 boed, up 1.6% from July and marking its second consecutive monthly record since the merger of Enauta and 3R Petroleum. The Atlanta field stood out, reaching its highest production level to date with 30,065 bbl/d.

    TechnipFMC signed two contracts with Petrobras to supply subsea flexible pipes from its Porto do Açu facility. The first, valued between USD 250–500 million, covers risers for gas injection in the Santos Basin pre-salt. The second, worth between USD 75–250 million, includes risers and flowlines for the Campos Basin.

    Fugro secured two three-year contracts with Constellation to provide ROV services for inspection, intervention and subsea surveys. Operations will start this quarter in the Campos Basin with the drillship Tidal Action and expand to the Equatorial Margin in 2026 with the Amaralina Star.

    Oceaneering closed multiple Petrobras contracts for Subsea Robotics services, totalling around USD 180 million over four years, with scope covering inspection, maintenance, repair, FPSO tie-ins and decommissioning. Its Norwegian subsidiary also signed a structural maintenance contract with Equinor, running until 2027 with possible extensions, covering both onshore and offshore facilities.

    Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies.

  • Petrobras relaunches BID

    Petrobras relaunches BID

    Petrobras has reissued BID 7004478234 for the chartering of up to six Service Operation Vessels (SOVs), following previous postponements. The new submission deadline is September 23 at 5:00 p.m. local time, as per latest circulars, with contracts typically lasting 730 days (two years) and extension options available.

    The company confirmed it has received requests and will publish revised technical specifications on the Petronect platform shortly. Key adjustments include a reduction of the gangway zero position from 25.5 to 25 meters, noting that a total gangway length exceeding 29m is required for this operation, alongside modifications to maximum vessel draft and other requirements, though these may still be subject to further refinements.

    For further details, contact us at comercial@cms.oneenergynews.com.

    Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies.

  • Discover One. Energy

    Discover One. Energy

    At WSB Advisors, we believe knowledge is one of the strongest assets in the offshore and energy markets. That is why we created One. Energy, our digital magazine dedicated to sharing insights, trends and perspectives that matter to industry professionals.

    Each edition brings articles on technology, regulation, energy transition and market strategies — all built on the expertise and data intelligence of WSB.One, our proprietary platform.

    We welcome contributions from industry experts and partners who want to share their views or showcase solutions. If you are interested in participating or advertising in One. Energy, feel free to reach out at comercial@cms.oneenergynews.com.

  • Open Tenders & More

    Open Tenders & More

    By Maria Eduarda Camba

    Dear All,

    WSB is pleased to provide an update on the current long-term tenders that are open to offer.

    Open tenders:

    What has changed?

    • Petrobras Up to 6x SOVs : Opportunity 7004478234 new deadline September 12th, 2025;

    What else is happening?

    • Petrobras SDSVs auction closed today, and the market now waits auction results to see which company(ies) will secure contracts.
    • A foreign vessel lined up for a Petrobras SEP contract is now flying Brazil flag and on-hire for 4 years firm. Yet another vessel under someone else’s REB tonnage. 
  • Breaking news

    Breaking news

    Karoon has announced planned investments between USD 55 million and USD 65 million in 2026 to revitalize the FPSO Cidade de Itajaí at the Baúna field, along with an additional allocation of up to USD 90 million between 2030 and 2034 to extend the unit’s operating life. The company also revised abandonment costs for the field, now estimated at USD 260 million through 2039. Following positive production results, proven and probable reserves increased by 35%, reaching 52.7 million barrels. The project’s economic life has been extended from 2032 to 2039, with production expected to continue until 2040.

    Petrobras expects to complete this week the Pre-Operational Assessment (APO) required to obtain Ibama’s license to begin oil exploration in well FZA-M-59, off the coast of Amapá. This step is regarded as the final stage before environmental clearance is granted and focuses on testing environmental safety, including simulated oil spills, equipment failures and emergency response protocols. The operation mobilizes around 400 professionals, 13 vessels and 3 aircraft. Ibama had previously denied the license request, but Petrobras sought reconsideration, committing to additional protection measures.

    Adding to the sector’s activity, Petrobras has also extended the deadline for Opportunity 7004478234, a significant tender for up to six Service Operation Vessels (SOVs), now set for September 12th, 2025..

    Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies.

  • Unlocking the Brazilian Offshore Market with WSB.One Intelligence

    Unlocking the Brazilian Offshore Market with WSB.One Intelligence

    The complexity and dynamic nature of the Brazilian offshore market demand a data source as robust as it is precise. Introducing WSB.One, the market intelligence platform meticulously developed in-house by WSB Advisors to be your competitive edge. WSB.One provides a comprehensive and continuously updated database featuring technical, commercial and contractual information on hundreds of offshore support vessels, rigs, and FPSOs operating in Brazilian waters. Our team of experts reviews and updates this data daily, ensuring you gain real-time access to crucial market movements and emerging trends.

    This unparalleled accuracy enables contracting companies not only to anticipate new business opportunities but also to map the competitive landscape with unprecedented clarity. It serves as your strategic compass, transforming raw knowledge into a tangible competitive advantage, identifying promising trends and driving the sustainable growth of your operations within the sector.

    How has market intelligence been a cornerstone for your strategic decisions in the current offshore landscape?

  • Vast: new project

    Vast: new project

    Vast Infraestrutura announced on Tuesday (August 26) the start of construction for the tank farm at the Liquid Bulk Terminal (TLA), in Porto do Açu, in São João da Barra. Since October 2024, the TLA has been operating with ship-to-ship transfers and the supply of marine diesel oil (MGO) and hydrotreated vegetable oil (HVO).

    The new facility will enable the storage and handling of additional petroleum derivatives and biofuels, with operations scheduled to begin in the last quarter of 2026. The project represents an initial investment of BRL 250 million, with a storage capacity of approximately 40,000 m³.

    Stay informed on key offshore developments — visit wsb-one.com, our data platform trusted by leading offshore companies.